How Aker BP and Cognite secured correct allocation of oil and gas with minimal production loss

Aker BP, a Norwegian oil exploration and development company, and Expert Analytics used Cognite Data Fusion® to develop a new algorithm for calibrating the sensor arrays essential to the correct allocation of hydrocarbons at the Alvheim field in the North Sea, enabling:

Industry Challenge

Calibrate multiphase flow meters and minimize production losses

Six oil companies have ownership in the hydrocarbons flowing from the 32 producing wells at the Alvheim field in the North Sea. The original field has three owners who split the revenue according to each company's share, but for the three fields that have been tied back to the existing Alvheim infrastructure, the situation is more complex.

Five companies in total have a stake in the produced hydrocarbons from these so-called third-party fields, and the fraction of ownership is unique for each field. This means that the flow from each field must be accurately monitored to ensure that the owners get their share of the produced oil and gas.

All third-party flowlines are routed to the same separator, known as the third-party separator, which separates the mixed fluid into oil, gas, and water streams. At this stage, all information about the amount of production from each specific field is lost. It is, therefore, necessary to perform accurate measurements of the flow from each field upstream of the separator. These measurements are done by dedicated multiphase flow meters (MPFMs) for each field.

An MPFM is an advanced device comprising an array of sensors that measure the individual phase flows of commingled oil, gas, and water. The MPFM outputs a proportional flow rate for each phase, but to transform that measurement into an absolute flow rate, the meter must be calculated with reference to a benchmark flow rate.

Sensors downstream of the separator that measures the flow of single-phase streams are more accurate and are therefore used as references during the MPFM calibration process.

The main challenge with the calibration in its current state is related to the infrastructure of Alvheim. The floating production, storage, and offloading (FPSO) vessel has only two topside inlet separators: one dedicated to the Alvheim field lines, the other to the third-party lines.

During the monthly calibration process two third-party lines are rerouted to the Alvheim separator, leaving only one line connected to the third-party separator for direct comparison with the calibration reference. This process is performed three times in order to calibrate each of the MPFMs for the third-party lines.

The rerouting causes the Alvheim separator to exceed its maximum capacity, requiring Aker BP to choke back production or close down wells during the calibration.

alvheim-fpso-1

Solution

An algorithm-based calibration method

Aker BP and Cognite have proposed and tested a new method for calibrating the MPFMs that leads to dramatically decreased deferrals and losses.

Aker BP and Cognite created an algorithm-based calibration method that dramatically reduced deferrals and losses. Using Cognite Data Fusion®'s contextualized data, the algorithm reduces the number of third-party lines that need to be rerouted to the Alvheim separator.

One version of the algorithm requires only a single line to be rerouted; another does away with rerouting altogether, using planned changes in production to calibrate the MPFMs practically losslessly.

uc2-png

Impact

Accurate, lossless calibration

By reducing the need to reroute lines, Aker BP can reduce the strain on the Alvheim separator.

Tests at the field have found that replacing the current method of calibrating the MPFMs with the new one would decrease deferrals by more than 95%, which would save Aker BP an estimated $3.5 million a year.

The method is easily scalable and would be applicable for future tie-ins to Alvheim. It is also believed that the new method can be used to reduce capital expenditures and improve the allocation accuracy of new field developments.